Monday, March 15, 2010

Kitchen cabinets: Phase Two

We reluctantly resumed our kitchen remodel. We've enjoyed are new sink, counter top, dishwasher, and cabinets so much that we haven't been motivated to install the two cabinets above the refrigerator and stove.

Here is the elaborate plan I drafted to show the electrician where we needed the plug:

Microwave Hood: Detailed plan

Fortunately, we had the electrician install the microwave/hood plug at the same time he did the counter top plug. It's not pretty, but I'm glad he did this:

Microwave Hood Step 2

Here is the wallboard. This is actually my first attempt. However, the wall board was too thick and I had to take this down. Unlike the other wall in which the plaster was much thicker than the drywall, on this wall the plaster seemed thinner (or maybe the wallboard I used this time was thicker than what we used on the other wall???). So, I removed this wallboard and cut the lathe and then reinstalled the wallboard. Very messy.

Microwave Hood Step 4

Here is joint compound which I glopped on. Fortunately, this will be hidden behind the cabinets, so we didn't feel the need for it to look perfect.:

Microwave Hood Step 5

Here is where we left off until next weekend:

Microwave Hood: Step 6

We'll assemble the cabinets this week. However, before we hang the cabinets on the wall, we'll need to figure out the venting. I'm still researching code and the installation manual, but we plan on running four-inch duct through the two cabinets and out the side of the house. We were tempted to avoid the venting issue use a ventless hood filter like our old apartment, but those vent-less filters don't work well.

Sunday, January 3, 2010

Kitchen cabinets: 95% done!!!

KitchBeforeDesignAfter2

KitchBeforeDesignAfter

Last night, we finished the last major portion of our kitchen cabinet install. The highlights:

  • 0. Design and Buy: We spent months measuring and using IKEA's handy kitchen planner. Our kitchen is a good size room, but every corner has a door or window which prevented designing a L-shaped layout. So, we settled on keeping the kitchen's original layout -- although we have moved the fridge to another wall against a window.

    Our original $600 plan ended-up becoming $2,800 plan. We had considered IKEA's VARDE free-standing kitchens which seemed easier, but the sizes didn't work out and had fewer options than the typical AKURUM built-in kitchen we selected. IKEA had a kitchen sale which compelled us to also order the microwave and cabinets for above the fridge/stove wall too. The IKEA Kitchen Planner totaled $2,500, but after the IKEA rep added all the little extras our plan was missing, we were closer to $2,900 before the discount.

    Unfortunately the day we ordered the cabinets, I also dislocated my knee cap, so the project was basically delayed a month while I was on crutches.

  • 1. Wall Cabinets: We liked the original old wall cabinets and considered keeping them because they were very large. However, the original cabinets were too tall and would have left us with one foot of clearance above any new base cabinets. Like most original carpentry in our house, we discover the cabinet was merely held in with nails so it was just a matter of pulling them down.

    The new cabinets are IKEA AKURUM with STAT White front. We wanted glass doors to match the original hutch on the other wall and considered having all four doors glass, but one of our final design decisions was to change the end doors to solid to hide the contents.

    Our only regret is installing the wall cabinets before installing the lighting and top molding. IKEA seems to assume wall cabinets will not be installed near the ceiling. We still need to ponder how we will install the lighting and top molding. I have a plan that involves my sister's petite arms.

  • 2. Base Cabinets Removal: The scariest decision was removing the original cabinets and sink because that was a point of no return. From our prior glimpses under the cabinets, we knew there was missing underlayment beneath the cabinets. Our first carpentry task was installing a 3x5-foot section of underlayment. It was pretty easy. Well, admittedly we had Home Depot cut the board to size, but still it seemed like a major task considering I haven't taking wood shop since 10th grade.

  • 3. Plumbing, Electrical, and Drywall: Originally, we thought we would be without a sink for a week while the plumbing and electrical were installed. Well, moving plumbing connections a couple of feet and installing a couple of outlets was a major project that took weeks to finish -- delayed in part due to Christmas. Instead of just patching a couple of holes, the entire bottom half of the lath and plaster wall had to be replaced which we had not anticipated. We insulated the exterior portion of the wall to protect the plumbing and eventually figured out how to install the wallboard. While our first wall installation is less than perfect, most of it will be covered by the cabinets and eventually tile backer board.

  • 4. Base Cabinets, Sink, Counter Top, and Dishwasher: The base cabinet assembling was as easy as the IKEA instructions stated. The only trick was figuring out that the DOMSJO sink also included the hardware for the base cabinet.

    We chose the NUMERAR oak countertops because they were relatively cheap and would match the oak floors in the rest of the house. The biggest challenge was figuring out how to cut the counter top which was delivered in one long piece. Fortunately the DOMSJO sink only requires a straight end cut, so we didn't have to cut a sink hole. My error was not supporting the counter top while cutting. The piece twisted and split at one corner, so we had to rotate the bad edge against the wall. Also not mentioned in the IKEA instructions and not obvious when first unpacking was that the counter top does have a top and bottom side as the bottom side is stamped at one corner. I also discovered that it is well worth buying a high quality circular saw blade instead of using the one that came with the saw.

    What we didn't realize with the NUMERAR counter top is that we now need to oil it daily FOR THE REST OF OUR LIVES.

  • 5. TOE KICK, TOP MOLDING, AND TWEAKS: We still have to install the toe kick and top molding. We also need to adjust one of the base cabinet doors and see if we can fit the dishwasher closer into the cabinet.
  • FIRST DRAFT

Wednesday, December 23, 2009

Avatar: C


Avatar Creature (not from the movie), originally uploaded by Adriano Muraca.

Scott complains that I rate nearly every movie a "C" -- except Star Trek. That may be true, but five days later, I can't say Avatar left much of an impression on me. It wasn't awful, but wasn't outstanding either.

The uninteresting soldier-infiltrates-the-primitive-natives story reminded me of Dances With Wolves. The heartless corporate militia bad guys seemed too inhumane and one dimensional. District 9 had many similar themes and storyline, but was more convincing and interesting.

The 3D and CGI were interesting gimmicks. But like the last three Star Wars movies, too much CGI just isn't convincing when it is overused. The avatar characters didn't seem real to me and many of the planet scenes seemed like trippy black light posters. Overall, the movie seemed more like a video game.

Sunday, December 6, 2009

2012: D


2012 movie poster, originally uploaded by heavenivk.

Wow, it's been nearly three months since I've seen a movie (in a theater). And yet there still wasn't anything I really wanted to see. Scott, ma, and I decided to see 2012 this afternoon. It lived up to our expectations as a big, CGI, disaster movie with a silly story and numerous plot holes. Worse, it was very long and boring at times. A couple seated behind us even louded complained about how long it was.

Sunday, November 29, 2009

house's first xmas decoration

After three weeks on crutches, this was my first productive weekend.

2009 Christmas Tree

We invited mom and Sheena to come over and decorate our GE Christmas tree on Saturday. Gordon loves the return of her tree.

2009 Christmas Lights

Scott and I splurged on our first Christmas lights for the house. We chose twinkling cool white LEDs. The LEDs go well with the house's blue-grey color. The eave and gutter clip system we found worked very well.

kitchen wall cabinets up

We also re-started our kitchen remodel and opened the IKEA boxes we ordered just before my knee accident. We installed a set of wall cabinets. It was a lot of work, but we got them up this evening. Next we'll work demolitioning the base cabinets and coordinating with our plumber.

Monday, November 23, 2009

patella week 3

kneecap week 3

Woo-hoo! I finally got into the knee clinic and have been freed from the crutches and full-leg brace. I'm now staggering around.

Saturday, November 21, 2009

new trees planted!

New Persian Ironwood

Trees from Friends of Trees

We love the two Persian Ironwoods Friends of Trees planted today. Scott volunteered with the group and planted 15 trees in another neighborhood while I watched another group plant our two trees with my crippled leg.

Monday, November 9, 2009

funny: variations of Poker Face

From last night's Family Guy Presents: Seth & Alex's Almost Live Comedy Show (via ohnotheydidnt). Yes, it's very immature and offensive, but still funny:


Christopher Walken also covered Poker Face last week:


And here is the original:

Wednesday, November 4, 2009

dislocated patella = bad

I thought I would be little healthier by walking to the bank instead of driving last night. Instead I tripped on an A-board, twisted my leg, and dislocated my patella (kneecap) resulting in drama: screaming... yelling... sobbing... strangers... tenants... paramedics... firemen... ambulance... drugs... ER... "the Michael Jackson drug"... wake-up... Scott... Walgreens... crutches... home.

Fortunately, I understand that a dislocated kneecap is not as bad as other knee injuries -- although at the time I couldn't imagine anything more torturous.

1104091212.jpg