After three years, we finally replaced the kitchen's ancient linoleum floor. Well, we splurged and had a professional install the Marmoleum.
unassociated stuff I think about: politics | movies | Portland | funny | OR | TV | gay | religion
Saturday, April 7, 2012
Tuesday, September 7, 2010
Backsplash DONE!
|
Kitchen Remodeling - Day 420: We finally installed the back splash behind the new counter top. 0. DESIGN: We spent months putting off the back splash project because we were indecisive. Scott had always talked about subway tiles, but there were so many distracting design options in the tile stores and design catalogs (i.e. ceramic tiles, stone tiles, glass tile, etc., etc.). We spent a long time going over the possibilities. There were many modern and stylish options, but we didn't want to do something trendy that would become dated and not match the house's age. Even though we plan on staying in the house a long time, we continue to be mindful that installing something too edgy/modern might turn-off potential buyers. We started buying samples about a month ago such as the subway tile and a sheet of colored glass tiles. However, I was very apprehensive about installing a color that we would be stuck with for years since changing tile is not as easy as painting. Eventually, we went back to Scott's original idea of classic white subway tile with a simple white trim row. 1. WALL PREPARATION: When we finally bought the tile, we were delayed a week just to prepare the walls. Most of the wall was new wall board; however, the baseboards were missing and the window trim wasn't right. A chunk of the left baseboard was torn out during the wall demo and the entire right baseboard was missing. Also, a prior owner cut into half of the window trim to install the previous linoleum back splash. It was surprisingly simple to replace the missing baseboards and window trim. I also found some handy extenders for the three electrical receptacle boxes. I understand that code requires that no gaps can be in the box, so the extenders were a good solution other than ripping open the wall and repositioning the boxes. 2. CUTTING AND SETTING TILE: Figuring how to cut the tile was the most difficult aspect of the project. Since subway tile is relatively small and thin, we figured that we did not need to rent or buy a tile saw. However, we did buy a RotoZip for the L-shape cut-outs. It took me a few days to figure out how to assemble the RotoZip and the best way of making cuts. Eventually I learned that I could make the straights cuts by pulling it toward myself. Although the RotoZip was handy, it is still a hand tool that isn't great for long, straight cuts. The most frustrating part of tile cutting was trying to consistently cut tiles lengthwise at the same height with the snap cutter. We'll definitely consider using a tile saw for the remaining tile projects. Aligning the tiles and spacers was tedious. We used the countertop as the reference for most of the first row of tiles, which worked well except above the sink. The area above the sink was tricky because we had to cut the most important first row of tiles, which came out a bit too low. It doesn't look awful and isn't worth tearing out and redoing, but it is noticeable if one studies the grout lines. It is bothersome to us because we know the defect is there, but I'll try to keep myself from pointing out the flaw to everyone. The top row under the wall cabinets was probably the worse because it borders the wallboard and plaster seam. Fortunately, it's hard to see unless you're sitting down or stick your head under the cabinets. |
3. GROUTING We procrastinated much of Sunday before doing the grout. We were both apprehensive about grouting. So, instead of just buying the grout, we went on a shopping spree to three other stores. However, we eventually came home a got the grout. Surprisingly, it wasn't difficult at all. It was messing, but clean-up was easy. The white grout made a huge difference in hiding all the little defects. Had I known what a difference it would have made, I would have grouted much sooner.
In a perfect world, we would have removed the cabinets and plaster, installed new wall board, tiled, and reinstalled the cabinets. However, considering that we did all the work on the weekends and while still using the kitchen, it still came out great. We just need to seal the grout. For some reason, the guide says we need to spray water on the grout for three days before sealing.
Next Projects: Tiling the back splash on the stove wall and then kitchen flooring. We're leaning toward hex floor tile with grey grout, but that may require too much upkeep for a kitchen. We found some neat ideas online, but we haven't found a local supplier for black hex tile. We're also considering other options such checkerboard tile or Marmoleum, but hex tile seems to be the direction we're going since it is already in the bathroom.
![]() finito, originally uploaded by sweber4507. We placed tiles working left to right figuring the wall area next to the left doorway would be the most visible. Our first day cutting and setting tile went very fast and we made it all the way to the sink. However, it took us two partial days to cut and set the tiles under the window to the wall. There were a lot of small frustrating cuts, the wall was very uneven as it transitioned from drywall to plaster, and all the tiles at the corner had to be custom sized as the adjoining wall is not straight. |
|
![]() GroutinProgress, originally uploaded by sweber4507. Wow, grout makes a huge difference. We briefly considered gray grout, but the white really helps hide all of my bad cuts and uneven tiles. |
|
![]() backsplashandhall, originally uploaded by sweber4507. Danaya will be very happy that we finally screwed the electrical receptacles in and put covers on. She scolded me for leaving the receptacles hanging out of the walls for so long. I got slightly over-sized receptacle covers to hide any bad cuts, but normal sized covers would have worked fine too. |
Sunday, July 4, 2010
Happy Independence Day!
|
I think I've been watching too much History Channel, but I really wanted to decorate the house for Independence Day. We went to Elmers Flag and Banner. I admit that I was a bit weary about putting up a flag. Will neighbors assume the worse -- that we're gun-toting, right-wing, Republican? The awkward trip to Elmers didn't settle my weariness. It's probably just me, but I couldn't help but feel like we walked into some secret Tea Party/militia man's basement bunker. That said, I was happy to find the same flag kit my grandmother had.
Sunday, June 13, 2010
Kitchen cabinets: DONE!!!
Yesterday, we finally finished the kitchen cabinets (mostly). The cabinets and microwave/hood for the kitchen's east wall have been sitting the basement for more than six months, but we finally got back into the kitchen remodeling mood.
![]() Originally uploaded by sweber4507 |
When we originally bought the house a year ago. The east wall had an old electric stove, tiny spice cupboard, and tiny base cabinet. The first thing we did was pull out the cupboard and cabinet (which is how we discovered everything in our 1929 house is held in with nails and can be easily pried loose with enough tugging). |
|
Although it's a bit tacky, we decided to install the new full-size fridge next to the stove and blocking part of the window. We had new electrical outlets installed, the furnace people installed a gas line, and we installed an old gas stove from craigslist. We also installed some metal racks above stove before we committed to cabinets. |
|
Installing cabinets on the east wall wasn't really a priority; however, IKEA had a sale if we bought two appliances. So, we added the microwave/hood and east wall cabinets to our order. And then left them in the basement for seven months. |
|
The electrician installed a dedicated circuit for the microwave/hood according to my detailed drawing. |
![]() |
I did a terrible job patching the electrician's hole, but it doesn't matter 'cuz it will be hidden behind the cabinets, right? |
![]() |
Last weekend, I got my first jigsaw and stupidly practiced my first cuts into our cabinet making a less than perfect hole for the hood vent. Even more stupid, I realize that we can't vent out the side of the kitchen because a stud in the exterior wall (and we have no interest in opening-up the wall to move studs). So, the jigsaw hole was for nothing -- although it will be helpful for when we do eventually decide to vent. |
![]() |
Yesterday, we hung the cabinets and microwave. For some strange reason, IKEA assumes we would leave space above the cabinets to reach around and screw-in the top molding. Our cabinets are nearly to the top of the wall, so we're going to ponder how to attach the molding. |
![]() |
Scott demonstrating that the cabinets were a terrible idea now that we will have to reach over the fridge to get to our precious cereals. More than the cabinets and microwave, Scott is excited about simply having a light over the stove. |
The only left to do now are to get some knobs from IKEA, finish the molding .... and tile the backsplash, and tile the floor, and maybe some more lighting, and the hood vent, and....
Saturday, March 27, 2010
garden border installed
Scott and I installed edging where our sloped front and side yards fall on the sidewalk. Although we would some day love to install a stone wall, for now we're using a cheap & easy eight-foot treated boards and Frame It All landscape edging kits from Home Depot.
While installing the edging, we discovered parts of our front lawn had taken over as much as a foot of the sidewalk. Scott even unknowingly managed to grow some of his plants in just six-inches of soil on top of the sidewalk.
Several people passing-by and neighbors complimented us on our yard. Someone even described the edging as a picture frame around a painting.
Monday, March 15, 2010
Kitchen cabinets: Phase Two
We reluctantly resumed our kitchen remodel. We've enjoyed are new sink, counter top, dishwasher, and cabinets so much that we haven't been motivated to install the two cabinets above the refrigerator and stove.
Here is the elaborate plan I drafted to show the electrician where we needed the plug:
Fortunately, we had the electrician install the microwave/hood plug at the same time he did the counter top plug. It's not pretty, but I'm glad he did this:
Here is the wallboard. This is actually my first attempt. However, the wall board was too thick and I had to take this down. Unlike the other wall in which the plaster was much thicker than the drywall, on this wall the plaster seemed thinner (or maybe the wallboard I used this time was thicker than what we used on the other wall???). So, I removed this wallboard and cut the lathe and then reinstalled the wallboard. Very messy.
Here is joint compound which I glopped on. Fortunately, this will be hidden behind the cabinets, so we didn't feel the need for it to look perfect.:
Here is where we left off until next weekend:
We'll assemble the cabinets this week. However, before we hang the cabinets on the wall, we'll need to figure out the venting. I'm still researching code and the installation manual, but we plan on running four-inch duct through the two cabinets and out the side of the house. We were tempted to avoid the venting issue use a ventless hood filter like our old apartment, but those vent-less filters don't work well.
Sunday, January 3, 2010
Kitchen cabinets: 95% done!!!
|
Last night, we finished the last major portion of our kitchen cabinet install. The highlights:
- 0. Design and Buy: We spent months measuring and using IKEA's handy kitchen planner. Our kitchen is a good size room, but every corner has a door or window which prevented designing a L-shaped layout. So, we settled on keeping the kitchen's original layout -- although we have moved the fridge to another wall against a window.
Our original $600 plan ended-up becoming $2,800 plan. We had considered IKEA's VARDE free-standing kitchens which seemed easier, but the sizes didn't work out and had fewer options than the typical AKURUM built-in kitchen we selected. IKEA had a kitchen sale which compelled us to also order the microwave and cabinets for above the fridge/stove wall too. The IKEA Kitchen Planner totaled $2,500, but after the IKEA rep added all the little extras our plan was missing, we were closer to $2,900 before the discount.
Unfortunately the day we ordered the cabinets, I also dislocated my knee cap, so the project was basically delayed a month while I was on crutches. - 1. Wall Cabinets: We liked the original old wall cabinets and considered keeping them because they were very large. However, the original cabinets were too tall and would have left us with one foot of clearance above any new base cabinets. Like most original carpentry in our house, we discover the cabinet was merely held in with nails so it was just a matter of pulling them down.
The new cabinets are IKEA AKURUM with STAT White front. We wanted glass doors to match the original hutch on the other wall and considered having all four doors glass, but one of our final design decisions was to change the end doors to solid to hide the contents.
Our only regret is installing the wall cabinets before installing the lighting and top molding. IKEA seems to assume wall cabinets will not be installed near the ceiling. We still need to ponder how we will install the lighting and top molding. I have a plan that involves my sister's petite arms. - 2. Base Cabinets Removal: The scariest decision was removing the original cabinets and sink because that was a point of no return. From our prior glimpses under the cabinets, we knew there was missing underlayment beneath the cabinets. Our first carpentry task was installing a 3x5-foot section of underlayment. It was pretty easy. Well, admittedly we had Home Depot cut the board to size, but still it seemed like a major task considering I haven't taking wood shop since 10th grade.
- 3. Plumbing, Electrical, and Drywall: Originally, we thought we would be without a sink for a week while the plumbing and electrical were installed. Well, moving plumbing connections a couple of feet and installing a couple of outlets was a major project that took weeks to finish -- delayed in part due to Christmas. Instead of just patching a couple of holes, the entire bottom half of the lath and plaster wall had to be replaced which we had not anticipated. We insulated the exterior portion of the wall to protect the plumbing and eventually figured out how to install the wallboard. While our first wall installation is less than perfect, most of it will be covered by the cabinets and eventually tile backer board.
- 4. Base Cabinets, Sink, Counter Top, and Dishwasher: The base cabinet assembling was as easy as the IKEA instructions stated. The only trick was figuring out that the DOMSJO sink also included the hardware for the base cabinet.
We chose the NUMERAR oak countertops because they were relatively cheap and would match the oak floors in the rest of the house. The biggest challenge was figuring out how to cut the counter top which was delivered in one long piece. Fortunately the DOMSJO sink only requires a straight end cut, so we didn't have to cut a sink hole. My error was not supporting the counter top while cutting. The piece twisted and split at one corner, so we had to rotate the bad edge against the wall. Also not mentioned in the IKEA instructions and not obvious when first unpacking was that the counter top does have a top and bottom side as the bottom side is stamped at one corner. I also discovered that it is well worth buying a high quality circular saw blade instead of using the one that came with the saw.
What we didn't realize with the NUMERAR counter top is that we now need to oil it daily FOR THE REST OF OUR LIVES. - 5. TOE KICK, TOP MOLDING, AND TWEAKS: We still have to install the toe kick and top molding. We also need to adjust one of the base cabinet doors and see if we can fit the dishwasher closer into the cabinet.
FIRST DRAFT
Sunday, November 29, 2009
house's first xmas decoration
After three weeks on crutches, this was my first productive weekend.
We invited mom and Sheena to come over and decorate our GE Christmas tree on Saturday. Gordon loves the return of her tree.
Scott and I splurged on our first Christmas lights for the house. We chose twinkling cool white LEDs. The LEDs go well with the house's blue-grey color. The eave and gutter clip system we found worked very well.
We also re-started our kitchen remodel and opened the IKEA boxes we ordered just before my knee accident. We installed a set of wall cabinets. It was a lot of work, but we got them up this evening. Next we'll work demolitioning the base cabinets and coordinating with our plumber.
Saturday, November 21, 2009
new trees planted!
We love the two Persian Ironwoods Friends of Trees planted today. Scott volunteered with the group and planted 15 trees in another neighborhood while I watched another group plant our two trees with my crippled leg.
Monday, October 26, 2009
kitchen remodel: phase 5 of 31
Scott and I both took a four-day weekend to paint the kitchen. We've watched too many one-day home improvement shows on HGTV and DIY Network because we completely underestimated how long it would take to paint the room. We spent Friday removing the wall cabinets, patching the walls, taping the room, and going to IKEA. We spent Saturday priming and Sunday painting the ceiling. We finally painted the walls today and met with the IKEA contractor and our plumber friend. Now we just need to paint the trim, order the new cabinets, build, install, have pluming and electrical work down, etc., etc., not to mention the flooring. So, we've merely started the kitchen remodel.
|
|
|
|
Tuesday, October 13, 2009
French drain AKA ditch
Before we could do a more visually satisfying home improvement project like paint the kitchen, Scott forced us to do the responsible thing and install a boring French drain before the fall rains. Its fancy European name is misleading as a French drain is basically a type of drainage ditch with pipe.
|
|
|
|






































